AE Smith

Integrated building services that keep facilities running at their best

Visit AE Smith

Nuvo

Electrical and technology solutions powering modern infrastructure

Visit Nuvo

Envar

Quality engineering and value‑driven delivery at the heart of every project

Visit Envar

Project

  • HVAC Design & Construct – Existing Building Refurbishment

Key Challenges

  • Installing significant new HVAC plant and equipment within an existing timber-truss roof structure with extremely limited space.
  • Coordinating new mechanical services around the constraints of the existing building and its established services.
  • Delivering HVAC works within a live hospital environment while considering ongoing operations.

Outcomes

Delivered a new VRF HVAC system for the 12-bedroom palliative care unit.

Integrated the new HVAC system with the hospital's existing BMS.

Delivered reliable comfort within a critical end-of-life care environment

The Client

NSW Health delivers healthcare services to communities across New South Wales.

The new Wyong Hospital Palliative Care Unit forms part of the NSW Government’s World Class End of Life Care Program, being delivered by Health Infrastructure.

Located on the Central Coast, the facility has been designed to support patients and their loved ones through end-of-life care closer to home. The purpose-built unit includes 12 patient bedrooms, family and communal spaces, and private gardens, creating an environment centred on comfort, privacy and dignity.

AE Smith was engaged by Renascent to deliver the HVAC component of the refurbishment and transformation of an existing building at Wyong Hospital.

What we achieved with our customer

Supporting a world-class end-of-life care environment.

AE Smith delivered the HVAC works for Wyong Hospital’s new Palliative Care Unit, supporting the transformation of an existing building into a purpose-designed healthcare environment.

The new unit provides spaces where patients can feel at ease, families can remain close and healthcare teams can focus on delivering care. AE Smith’s mechanical services contribution helps maintain the comfortable, controlled environment these spaces require.

 

A new integrated VRF solution.

Working under a design and construct model, AE Smith delivered a new Variable Refrigerant Flow (VRF) HVAC system, integrated with the hospital’s broader Building Management System (BMS).

The system supports the bedrooms, family areas and shared spaces, providing environmental comfort while operating quietly behind the scenes.

 

Working within significant existing-building constraints.

The project involved the extensive refurbishment of an existing building at the eastern end of the Wyong Hospital campus.

AE Smith’s team was required to accommodate significant new plant and equipment within an existing timber-truss roof structure where space was extremely limited.

Careful planning and coordination were essential to integrating the new mechanical services with the existing building infrastructure while meeting the requirements of a contemporary healthcare facility.

 

Supporting critical patient care spaces.

The completed HVAC installation provides environmental comfort within the rooms and spaces of the new palliative care facility. For a project centred on end-of-life care, providing a comfortable environment is particularly important for the patients, families and staff who rely on these spaces.